Water Valve Replacement Drags On
A contractor working for WASA has been replacing a large water/sewer valve at the intersection of 5th and Quincy for weeks. I haven’t been counting, nor do I know how long it should take, but it does seem to be dragging on.

May 20, 2009 at 7:39 pm
Based on the temporary no parking signs, work looks like it began on or about April 6th.
June 23, 2009 at 9:02 am
[...] Replacement Nearing Completion About a month into the WASA project at 5th and Quincy, NW, I asked how long one of these projects is supposed to take. It looks like I finally have my answer. After about two [...]